Torrance Transit Center
General information
Location465 Crenshaw Blvd.
Torrance, California
Coordinates33°50′32″N 118°19′47″W / 33.8421°N 118.3296°W / 33.8421; -118.3296
Operated byTorrance Transit
Line(s)See Services section
Platforms1 island platform
Bus stands8
Construction
AccessibleYes
History
OpenedJune 9, 2023 (2023-06-09)
Location

The Torrance Transit Center (officially the Mary K. Giordano Regional Transit Center) is a bus station in Torrance that serves as the city's transport hub. It opened on June 9, 2023.[1][2] The station is planned to serve as the southern terminus of the Los Angeles Metro Rail C Line via a proposed extension.[3]

History

The previous bus hub in Torrance, located at the Del Amo Fashion Center, ceased operation in 2005.[4] Design and contracting of the new facility was rebooted in 2013 as initial designs did not adequately facilitate riders' needs.[4] Ground was broken for the station in 2018.[5] The transit center held a grand opening "open house" on June 9, 2023.[6] Two days later, on June 11, Torrance Transit underwent a service-wide change in which Lines 1, Rapid 3, 4X, 5, 6, and 10 started servicing the new transit center.[7]

Service

Seven Torrance Transit routes currently serve the new Torrance Transit Center.

Services from Torrance Transit Center
Route Destination Notes
1 Harbor Freeway station (northbound)
Del Amo Fashion Center (southbound)
Rapid 3 Downtown Long Beach Weekday peak service only.
4X Downtown Los Angeles (northbound)
Walteria (southbound) Weekdays only. Saturday trips end at Torrance Transit Center to the west.
5 El Camino College (northbound) Interlines with Line 2, which heads to Del Amo Mall.
PCH/Crenshaw (southbound)
6 Del Amo Fashion Center (westbound) Weekday peak service only.
Artesia station (eastbound)
10 Downtown Inglewood station (northbound)
PCH/Crenshaw (southbound)
10X SoFi Stadium During game days on Sundays.

References

  1. "Mary K. Giordano Regional Transit Center". Torrance Transit. Retrieved January 31, 2023.
  2. "Press Release - Torrance Transit System Celebrates Grand Opening of the Mary K. Giordano Regional Transit Center". Torrance Transit. Retrieved June 11, 2023.
  3. "Draft Environmental Impact Report (EIR) available for C Line (Green) Extension to Torrance". Metro. Retrieved January 30, 2023.
  4. 1 2 Green, Nick (December 12, 2013). "Construction delayed on $21 million Torrance Transit Center". Daily Breeze. Retrieved January 31, 2023.
  5. Sharp, Steven (July 9, 2021). "Long-delayed Torrance Transit Center starts to take shape". Urbanize. Retrieved January 31, 2023.
  6. "Transit center opens in Torrance, brings enhanced transportation to South Bay region". CBS News. Retrieved June 11, 2023.
  7. "2023 Service Changes". Torrance Transit. Retrieved June 6, 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.