Line D
Overview
Native nameLigne D
Termini
  • Gare de Vaise
  • Gare de Vénissieux
Connecting linesLyon Metro Lyon Metro Line A Lyon Metro Line D
Funiculars of Lyon Funiculars of Lyon Funiculars of Lyon
Lyon tramway Lyon tramway#Line T1 Lyon tramway#Line T2 Lyon tramway#Line T4 Lyon tramway#Line T5 Lyon tramway#Line T6
Stations15[1]
Service
TypeRapid transit
SystemLyon Metro
Operator(s)TCL
Rolling stockMPL 85
RidershipAnnual: 84,201,000 (2019) [2]
History
Opened9 September 1991[1]
Last extension28 April 1997[1]
Technical
Line length12.5 km (7.8 mi)[1]
CharacterDriverless (MAGGALY)
Rack systemNone
Track gauge1,435 mm (4 ft 8+12 in) standard gauge with rollways outside of track
Electrification750 V DC third rail (guide bars)
Average inter-station distance929 m (3,048 ft)

Line D (Ligne D) is a rapid transit line on the Lyon Metro. It runs east–west underneath the two major rivers of Lyon, France, connecting Vieux Lyon with the Presqu'ile and the Part-Dieu region. Line D commenced operation under human control on 4 September 1991, between Gorge de Loup and Grange Blanche.[1] It was extended from Grange Blanche to Gare de Vénissieux on 11 December 1992, when it switched to automatic (driverless) operation, also known as MAGGALY (Métro Automatique à Grand Gabarit de l’Agglomération Lyonnaise).[1] On 28 April 1997, the line was extended from Gorge de Loup to Gare de Vaise.[1]

Being the deepest of the lines in Lyon, it was constructed mainly using boring machines and passes under both rivers, the Rhône and the Saône. At 12.5 kilometres (7.8 mi) long[1] and serving 15 stations,[1] it is also the longest metro line in Lyon.

List of the stations

  • Gare de Vaise Lyon-Vaise station
  • Valmy
  • Gorge de Loup Lyon-Gorge-de-Loup station (Western Lyon tram-train)
  • Vieux Lyon–Cathédrale Saint-Jean Funiculars of Lyon Funiculars of Lyon Funiculars of Lyon
  • Bellecour Lyon Metro Lyon Metro Line A
  • Guillotière–Gabriel Péri Lyon tramway Lyon tramway#Line T1
  • Saxe–Gambetta Lyon Metro Lyon Metro Line B
  • Garibaldi
  • Sans Souci
  • Monplaisir–Lumière
  • Grange Blanche Lyon tramway Lyon tramway#Line T2 Lyon tramway#Line T5
  • Laënnec
  • Mermoz–Pinel Lyon tramway Lyon tramway#Line T6
  • Parilly
  • Gare de Vénissieux Lyon tramway Lyon tramway#Line T4 Vénissieux station
Map of the line

Chronology

  • 9 September 1991: Opening of line D from Gorge de Loup to Grange Blanche
  • 11 December 1992: Extension from Grange Blanche to Gare de Vénissieux
  • 28 April 1997: Extension from Gorge de Loup to Gare de Vaise

Rolling stock

Since the opening of the line in 1991, there are 36 MPL 85 trains. The MPL 85 are composed of 2 cars per trainset.

From 2020, only during peak hours, each train could combine two MPL 85 trainsets and form a single train of 4 cars.

In 2016, new MPL 16 trains have been ordered to Alstom. 18 of them will circulate on the line starting from 2027, in addition to MPL 85 trains. The 2 cars of each train will be connected with gangways, which is a novelty in Lyon Metro rolling stock.

The MPL 16 trains won't be able to run on the line D with the current driverless system, MAGGALY. To overcome this problem, the line D will get a new driverless system, the same as the one equipping line B since 2022, where MPL 16 circulate too.

References

  1. 1 2 3 4 5 6 7 8 9 "Le Métro sur le réseau TCL" [The Metro/Subway of TCL's network] (in French). TCL - SYTRAL. Archived from the original on 2014-10-08. Retrieved 2013-09-28.
  2. "Délibération N°20.048 : Rapport Annuel des Délégataires – Année 2019" [Deliberation N°20.048 : Annual report by delegated operators – Year 2019] (PDF). SYTRAL (in French). 17 December 2020. p. 12. Retrieved 27 November 2023.