Chengdu Metro Line S3 | |
---|---|
S3 | |
Overview | |
Owner | City of Chengdu |
Locale | Chengdu & Ziyang, Sichuan Province |
Termini |
|
Stations | 7 |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Operator(s) | Chengdu Metro Corporation |
History | |
Planned opening | 2024 (Planned)[1] |
Technical | |
Line length | 38.7 km (24.0 mi)[2] |
Number of tracks | 2 |
Character | underground and elevated |
Electrification | overhead lines, 1,500 V DC |
Operating speed | 160 km/h[3] |
Line S3 of the Chengdu Metro (simplified Chinese: 成都地铁S3号线; traditional Chinese: 成都地鐵S3號線), also known as Ziyang Line (Chinese: 资阳线), is an under construction rapid transit line in Sichuan Province, China. The line is 38.7 km long and connects Futian station in Chengdu to Ziyang North railway station in Ziyang.[2][4] It is expected to open in late 2024.
Description
The line will use 160 km/h Type-A trains. The investment is 14.93 billion CNY. The line will have both underground and ground level sections. It also passes through Tuo River between 1st Tuo River Bridge and 3rd Tuo River Bridge.[5]
Total investment for the line is 14.93 billion CNY.[6] 40% is paid by Chengdu; relocation fee in Ziyang is paid by Ziyang Government; 54.1% left is mortgage from bank.[7]
Stations
Station name[11] | Transfer | Distance (km) |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Futian | 福田 | 18 | 0 | Jianyang, Chengdu | |
Lujia | 芦葭 | ||||
Ziyang Linkong | 资阳临空 | Yanjiang District, Ziyang | |||
Xingfu Avenue | 幸福大道 | ||||
Changhong Square | 苌弘广场 | ||||
Baotai | 宝台 | ||||
Ziyang North Railway Station | 资阳北站 | 38.7[2] | |||
Operation
Operation Phase | Train Type | Cabin number | Operation Speed (km/h) | Frequency (Trains/Hour) | Interval (Mins) | Capacity (Riders/Hour) |
---|---|---|---|---|---|---|
Opening Phase | A | 4 | 140 | 6 | 12 | 4500 |
Short-term | A | 4 | 140 | 12 | 5 | 8900 |
Long-term | A | 4 | 160 | 15 | 4 | 11100 |
The line uses Type-A Trains operating at 160 km/h speed and powered by 25kV AC overhead lines.
The whole line will use 4-car Trains in opening and foreseeable future, with 11 Trains (44 Cars) planning to be purchased.[13]
References
- ↑ "轨道交通资阳线获审批通过!" (in Chinese). 四川在线 Sichuan Online. 2020-08-06. Retrieved 2017-08-06.
- 1 2 3 "轨道交通资阳线工程首次环境影响评价信息公开". 2020-09-17. Archived from the original on 2020-10-17. Retrieved 2022-08-01.
- ↑ "轨道交通资阳线,批了!" (in Chinese). 网易新闻(资阳发布). 2020-08-06. Retrieved 2017-08-06.
- ↑ "轨道交通资阳线工程正式获批 成资同城化将更近一步" (in Chinese). 四川在线 Sichuan Online. 2020-08-06. Retrieved 2017-08-06.
- ↑ "轨道交通资阳线工程正式获批 成资同城化将更近一步" (in Chinese). 四川在线 Sichuan Online. 2020-08-06. Retrieved 2017-08-06.
- ↑ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川在线 Sichuan Online. 2020-08-06. Retrieved 2017-08-06.
- ↑ "地铁S3资阳线与18号线"同型"车,最高160KM/h" (in Chinese). 今日头条 toutiao. 2020-08-08. Retrieved 2020-08-08.
- ↑ "轨道交通资阳线年底前开工建设 预计2024年底通车试运营".
- ↑ "速看!轨道交通资阳线实现全线桥通".
- ↑ "轨道交通资阳线,预计明年9月通车!" (in Chinese).
- ↑ "关于征求轨道交通资阳线(资阳境内)车站命名意见的公告". 2023-05-22. Archived from the original on 2023-08-01. Retrieved 2023-08-01.
- ↑ "地铁S3资阳线与18号线"同型"车,最高160KM/h" (in Chinese). 今日头条 toutiao. 2020-08-08. Retrieved 2020-08-08.
- ↑ "地铁S3资阳线与18号线"同型"车,最高160KM/h" (in Chinese). 今日头条 toutiao. 2020-08-08. Retrieved 2020-08-08.