Thomson–East Coast MRT line

The Thomson-East Coast Line (TEL) is the sixth MRT line in Singapore. It is the fourth line to be fully automated and driverless in Singapore. The line will be 43 km (27 mi) long, with 31 stations. The line is colored brown on the MRT Rail map.


Thomson–East Coast Line
CT251 train arriving at Woodlands MRT station
Overview
Native nameMalay: Laluan MRT Thomson-Pesisir Timur
Chinese: 汤申-东海岸地铁线
Tamil: தாம்சன் - ஈஸ்ட் கோஸ்ட் எம்ஆர்டி வழி
StatusOperational (Stage 1-3)
Under construction (Stages 3-5)
Under planning (extension to Changi Airport)
OwnerLand Transport Authority
LocaleSingapore
TerminiWoodlands North
Caldecott (till 2022)
Stations32 (20 operational, 12 under construction)
Service
TypeRapid transit
SystemMass Rapid Transit (Singapore)
Services1
Operator(s)SMRT Trains Ltd (SMRT Corporation)
Depot(s)Mandai
East Coast (Future)
Rolling stockCT251
Daily ridership28,517 (July 2020)[1]
History
Planned opening2024 (Stage 4)
2025 (Stage 5)
2027 (Founders' Memorial MRT station)
2040 (extension to Changi Airport)
Opened31 January 2020 (2020-01-31) (Stage 1)
28 August 2021 (Stage 2)
13 November 2022 (2022-11-13) (Stage 3)[2]
Technical
Line length30.4 km (18.9 mi) (Operational)
13.0 km (8.1 mi) (Under construction)
CharacterFully Underground
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification750 V DC Third Rail[3]
Operating speed90 km/h (56 mph)
Route map
Thomson–East Coast Line
Johor Bahru–Singapore RTS
to Bukit Chagar
 RTS 
 TE1 
Woodlands North
 NS9 
 TE2 
Woodlands
 TE3 
Woodlands South
Mandai Depot
 TE4 
Springleaf
Seletar Expressway
 TE5 
Lentor
 TE6 
Mayflower
Kallang River
 CR13 
← to Jurong Lake District
to Aviation Park
 TE7 
Bright Hill
 TE8 
Upper Thomson
 CC17 
 TE9 
Caldecott
 TE10 
Mount Pleasant
Pan Island Expressway
 DT10 
← to Bukit Panjang
to Expo
 TE11 
Stevens
 TE12 
Napier
 TE13 
Orchard Boulevard
 TE14 
Orchard
 NS22 
 TE15 
Great World
 TE16 
Havelock
Central Expressway
 EW16 
 TE17 
Outram Park
 NE3 
← to HarbourFront
to Punggol
 TE18 
Maxwell
 TE19 
Shenton Way
 NS27 
 CE2 
← to HarbourFront
to Stadium
 TE20 
Marina Bay
 TE21 
Marina South
 TE22 
Gardens by the Bay
Marina Reservoir
 TE22a 
Founders' Memorial
East Coast Parkway
 TE23 
Tanjong Rhu
 TE24 
Katong Park
 TE25 
Tanjong Katong
 TE26 
Marine Parade
 TE27 
Marine Terrace
Siglap Canal
 TE28 
Siglap
 TE29 
Bayshore
 TE30 
Bedok South
 TE31  DT37 
Sungei Bedok
Sungei Bedok
East Coast Integrated Depot
Downtown Line
to Bukit Panjang
future extension
to Changi Airport T5

The Thomson Line section was announced on 29 August 2012. The Eastern Region Line section was announced on 15 August 2014. Both were put together to form the Thomson-East Coast Line.

The first and second stage of the line opened on 31 January 2020 and August 28, 2021. The third stage opened on November 13, 2022 with the other two stages expected to open from 2024 to 2025. It interchanges with all existing lines. When the first three stages opened, it is expected to serve about 500,000 commuters daily.

Stations

Station Number Station Name Interchange/Notes
Stage 1
 TE1 Woodlands North
 TE2  NS9 WoodlandsNorth South line
 TE3 Woodlands South
Stage 2
 TE4 Springleaf
 TE5 Lentor
 TE6 Mayflower
 TE7 Bright Hill
 TE8 Upper Thomson
 TE9  CC17 CaldecottCircle line
Stage 3
 TE10 Mount Pleasant
 TE11  DT11 StevensDowntown line
 TE12 Napier
 TE13 Orchard Boulevard
 TE14  NS22 OrchardNorth South line
 TE15 Great World
 TE16 Havelock
 TE17  EW16  NE3 Outram ParkEast West line
North East line
 TE18 Maxwell
 TE19 Shenton Way
 TE20  NS27  CE2 Marina BayNorth South line
Circle line
 TE21 Marina South
 TE22 Gardens by the Bay
Stage 4 (under construction)
 TE23 Tanjong Rhu
 TE24 Katong Park
 TE25 Tanjong Katong
 TE26 Marine Parade
 TE27 Marine Terrace
 TE28 Siglap
 TE29 Bayshore
Stage 5 (under construction)
 TE30 Bedok South
 TE31  DT37 Sungei BedokDowntown line

References

  1. "Land Transport DataMall". mytransport.sg. Archived from the original on 21 August 2020. Retrieved 20 August 2020.
  2. https://www.smrt.com.sg/Portals/0/InvestorRelations/Ops%20Review/SMRT%20Trains%20Ops%20Review%202020.pdf
  3. "LTA | News Room". Archived from the original on 5 September 2020. Retrieved 22 January 2020.

Other websites

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.